摘要:簡介:挪威斯塔萬格國際研究院(IRIS)發(fā)明了一種新鉆井方法,它有針對性的解決了連續(xù)管鉆井過程中清潔井眼和鉆壓控制等問題。可行性研究表明,使用這種已成熟應(yīng)用的方法,也可以解決有接頭鉆桿鉆井中遇到的一些問題。 A JIP proves ...

簡介:挪威斯塔萬格國際研究院(IRIS)發(fā)明了一種新鉆井方法,它有針對性的解決了連續(xù)管鉆井過程中清潔井眼和鉆壓控制等問題。可行性研究表明,使用這種已成熟應(yīng)用的方法,也可以解決有接頭鉆桿鉆井中遇到的一些問題。

A JIP proves the effectiveness of a new drilling method at IRIS’s Ullrigg facility. 

The new drilling method is based on a patented drilling fluid flow arrangement. It incorporates a pipe-in-pipe concentric drill, where one conduit is used to pump fluid into the well and the other carries the return fluid from the well. A sliding piston, attached to the drillstring downhole, separates dual-gradient annular drilling fluid and aids in pressure/traction control. Lastly, an optional liner can be inserted while drilling and expanded downhole during the same run. This option enables mono diameter well designs, simultaneously drilling and lining the well.

DRILLING RIG ADAPTATION 

The Ullrigg Drilling and Well Centre is a well-equipped, full-scale drilling rig with pumps, mud cleaning system, storage tanks, well-control equipment, 5-in. drill pipe etc. The vertical U1 well was used in the verification program. It has 13 3/8-in. surface casing to 354-m (1,161-ft) MD, and a 12 ¼-in. openhole section to 1,258-m (4,127-ft) MD. A 300-m-long 13¾-in. casing was installed and an 80-m-long cement plug was placed in the casing’s lower part for the drilling tests. 

The basic drilling setup uses a top-string adapter, the dual drillstring, a sliding piston, dual float and flow crossover. The setup is the same for both plain and line drilling, with field-proven rotating BOP and under-reamer technology used as enablers of the system, Fig. 1.


The idea for a new drilling method was born at Rogaland Research, now the International Research Institute of Stavanger (IRIS) in Stavanger, Norway. The idea was motivated by the challenges of solving hole cleaning and weight-on-bit control for coiled tubing drilling applications. After a feasibility study, the method was refined and found applicable to solve several challenges for jointed pipe drilling as well. The patented Reelwell Drilling Method showed unique features for the following applications: 

• Managed pressure drilling: Pipe connections can be performed at constant downhole pressure without any shut-in pressure at surface using a downhole valve.
• Liner drilling: A liner can be installed in the same run, while a new section is being drilled. Also, there is an option to expand the liner in the same run.
• Deepwater drilling: Return fluid is transported back to surface through the drillstring, enabling advanced gradients of the annular well fluid.
• Extended-reach drilling: The method generates hydraulic thrust downhole and offers unique hole cleaning capability. 

In 2004, Reelwell was founded and acquired intellectual property rights to the technology. A joint industry project to verify the method was then conducted from 2005-2008, funded by StatoilHydro, Shell and the Research Council of Norway. Beginning in 2005, the Research Council of Norway and Statoil funded a feasibility study, which was conducted by Reelwell. In 2006, Shell joined the project and the critical components were built and tested in the laboratory. Last year, a full-scale prototype was tested at IRIS using the research rig, Ullrigg. 

The main goal for the project was to verify the: 

• Proof of concept and its practical application on conventional drilling rigs
• Capability for hole cleaning and downhole pressure/traction control
• Drill-in liner application and optional liner expansion.
This article presents the basics of the method and the results from the verification program. 

Fig. 1 . The verification program tested plain drilling and liner drilling using two different tool sets.

Plain drilling’s equipment arrangement is shown on the left side of the figure. The sliding piston is attached to the dual drill pipe some distance above the lower BHA. The dual float and flow crossover are positioned at the top of the lower BHA. 

Liner drilling’s arrangement is shown on the right side of the figure including: a liner coupling attached to the dual float in the lower BHA, a liner expander, attached to the sliding piston and a liner attached between the liner coupling and the liner expander. 

The surface system includes a mud pump, which pumps drilling fluid into the side entry port of the top-string adapter and down the annular drillstring channel. The returning fluid comes back through the inner channel of the dual drillstring and passes through a surface choke system before returning to the shaker and mud tanks, Fig. 2. On the top of the BOP is a Rotating Control Device (RCD), which allows well annulus pressurization while drilling. The upper well annulus, between the sliding piston and the RCD, is pressurized by a pump.


Fig. 2 . This flow schematic of the surface system includes a mud pump, a surface choke system shaker, mud tanks and rotating control device on the top of the BOP.

The drilling sample consisted of a 300-m-long, 10¾-in. casing assembly hanging in the wellhead. The lower casing joint had a welded steel plug on the bottom end. The casing contains an 80-m cemented section on the bottom, covered by 15 m of sand, which was used for the drilling trials. The sand was removed from the well for inspection after drilling and lining was completed. 

A ¼-in. hydraulic control line is installed in the annulus between the 133/8-in. casing and the 10¾-in. casing to measure well pressure while drilling and for kick trials. The upper end of the line is connected to a pressure gauge at surface near the wellhead. The lower end of the line is connected to the inside of the 10¾-in. casing through a hole drilled in the casing at about 200 m depth, i.e. 100 m above the bottom steel plug. 

The 10¾-in. casing joints in the drilling sample were point welded in the connections to avoid unscrewing during drilling trials and the casing was locked for possible rotation at the casing hanger by a special arrangement. The 10¾-in. drilling sample was removed from the well after testing. 

At Ullrigg, the drilling fluid flow arrangement was modified, Fig. 3. The fluid is pumped into the side entry port of the top-string adapter through a separate 2-in. hose from the pump manifold. The return flow from the well comes from the top of the top-string adapter, through the main mud hose. From the standpipe the fluid flows through a 2-in. hose via the choke and down to the normal return-flow conduit.


Fig. 3 . At Ullrigg, the drilling fluid flow arrangement was modified so that the return flow from the well comes from the top of the top-string adapter, through the main mud hose.

TOOLS AND EQUIPMENT 

The following tools were used for plain drilling. The top-string adapter is positioned at the top of the dual drill pipe. This adapter contains a swivel and has one flow port to allow pumping drilling fluid down into the well and another port for the return flow from the well. The top-string adapter is attached to a hose for the side-entry inflow and is attached to the conventional swivel in the travelling block for the return flow. 

The dual drill pipe is a conventional 5-in. drillstring that was modified with inner pipe inserts in a patented arrangement. This allows for quick and easy modification of a conventional drillstring into a dual drillstring at the wellsite. 

The sliding piston is attached to the dual drill pipe downhole. It is arranged to always run inside the casing, and isolates the well annulus outside the dual drillstring. The piston allows for bypass flow when required, but also allows pressurization of the well annulus between the piston and the BOP/RCD. This arrangement converts the well into a hydraulic cylinder, where the sliding piston is the cylinder piston and the dual drillstring is the cylinder rod. The sliding piston allows the use of different fluid properties below and above the piston. Thus, it is possible to have a high-density kill mud in the well above the sliding piston, while the fluid in the well below the sliding piston is a lower density active circulation fluid. 

The dual float is a patented automatic pressure-operated valve positioned at the lower end of the dual drill pipe. This float enables simultaneous closure and opening of both drillstring channels. In the failsafe default position, the valve closes both channels. The float enables downhole isolation of the well and thus pressure-less connections at surface during Managed Pressure Drilling (MPD). 

The data acquisition and sensor package contains pressure sensors and flowmeters. The in-flow meter is mounted at the standpipe manifold and the return flowmeter is mounted at the exit of the return choke. The system has built-in computer models for diagnosis and control. 

The RCD was rented from Weatherford, a Williams model 9000. The tool is a simple, passive RCD with a 500 psi maximum pressure rating.
The upper annulus control consists of a pump set up for a maximum flow of about 400 liters per minute (lpm). The pump is remotely controlled from the driller’s cabin. 

The return choke was a remote dual choke, rented from Ullrigg. The choke panel was positioned next to the driller cabin to ensure easy communication between the driller and the choke operator. 

LINER DRILLING TOOLS 

Several additional pieces of equipment are needed for liner drilling. The liner expander is a patented system. The liner coupling is also patented and allows for the coupling of the liner to the drillstring with built-in switches for flow and rotation control.
The under-reamer, a DTU 7200, was rented from Smith. The under-reamer was mounted directly to a 7 7/8-in. tri-cone drill bit from Smith. This tool opened the hole from 7 7/8-in. to 9 1/2-in. 

The spider acts as a secondary drill floor and enables the setting of slips on the drill pipe when running the drillstring through the 8 5/8-in. liner, while the liner hangs in slips at the drill floor. It was rented from Odfjell. 

Ullrigg was set up for rotation with a hexagonal kelly. The kelly was modified with an inner string to match the inner string in the dual drill pipe. The top-string adapter was mounted on the top of the kelly. 

RESULTS 

After the 10¾-in. casing sample was installed and the BOP was mounted, the drilling sample was pressure tested to 270 bar against the closed BOP shear ram. The RCD was installed and tested prior to drilling. 

Figure 4 presents the results from the initial pressure tests of the upper annular volume in the well, i.e. the volume enclosed by the following surfaces: in the radial direction between the outside of the dual drill pipe and the inside of the 10¾-in. casing, and in the axial direction between the closed annular BOP and the sliding piston.


Fig. 4 . During the annulus test, the hook load increases in steps according to the increase in the annular pressure, demonstrating the hydraulic force transfer capability of the sliding piston.

During the test sequence, the pressure in the well annulus was increased stepwise to 50 bar using the upper annulus control pump. The test was performed with continuous circulation through the drill bit. The hook load increased in steps according to the increase in the annular pressure demonstrating the hydraulic force transfer capability of the sliding piston to the hook load. It also demonstrates the sealing capability, since there was no need to supply fluid to hold the pressure. 

When the drillstring is first lowered into the hole, and then pulled out of the hole, the return flow from the well responds immediately when moving the drillstring, Fig. 5. When not moving the drillstring, the return flow and the inflow have equal value. When moving the drillstring into/out of the well, the return flow increases/decreases respectively, due to the added closed-end steel volume that is lowered into the well.


Fig. 5 . When moving the drillstring inside the well, the return flow responds immediately when the drillstring is moved.

The figure shows that differential flow can be measured precisely and that the sensitivity to detect kick and drilling fluid loss is high. The resolution in measuring the volume changes by the differential flow arrangement is judged to be less than 10 lpm, i.e. very precise and fast compared to conventional detection methods. 

Drilling trials. Figure 6 presents the records from drilling one drill pipe joint through the cement plug using the plain drilling system. The pipe joint was drilled down in 40 min. with ROP up to 20 m/hr. The return flowrate is generally slightly higher than the inflow rate during drilling. Spikes occur in the return flow measurement at startup, and occasionally in the following minutes due to pipe movements etc. Occasional leaks were observed on the RCD during the trials, especially when the tool joints passed through the rubber sealing element.


Fig. 6 . When drilling the cement with the plain drilling system the return flowrate is slightly higher than the inflow rate.

Cuttings transport. The cuttings are particles with a maximum size of a few millimeters. However, in some instances particles of 1-3 cm were produced and efficiently transported to the surface during drilling operations. 

The demonstration program verified efficient transport of solids up to 10% concentration by volume. No plugging of the return flow conduit occurred during the tests. This demonstrates very high cleaning efficiency, and indicates the potential of the method to solve hole cleaning problems experienced in the field. The surface choke once showed a tendency to accumulate cuttings; however, it was successfully cleaned by flushing. 

Downhole pressure control. The pressure control system in the upper annulus above the sliding piston operated efficiently and reliably. When drilling, downhole pressure is determined by the drilling fluid density and the dynamic friction component in the return flow. When the pump is stopped, the dynamic component is zero. 

To keep constant downhole pressure in the well while the mud pump is stopped, pressure regulation is done by choking the return flow. After the dual float is closed, pressure in the well is isolated downhole by the sliding piston and the dual float. Thus, during connections there is no surface pressure. 

When restarting circulation after the connection, the dual float is again opened, and the circulation flowrate is established and adjusted, so that all required choking is performed through the return conduit and little or no choking is performed at the surface. The system’s capability to keep the downhole pressure near constant during connections was successfully proven during the test program. 

Controlling influx and loss. Proper well control was demonstrated by precisely measuring the gain/loss from the well, controlling gain/loss rapidly by choke or flowrate control and by closing the dual float to isolate the well at depth. The flow sensor arrangement enabled fast and precise detection of kick and loss, and both control methods were successfully demonstrated. The ability to avoid loss of the annular well fluid above the sliding piston was demonstrated in the pressure tests. The establishment of detailed well control procedures and the certification of tools are ongoing. 

Pipe handling. Figure 7 presents the situation while handling dual drill pipe, showing a connection at the drill floor. In general, the pipe handling was performed without any large difficulty or problem. Prior to operations, the return pipes were individually adapted and inserted into the conventional 5-in. drill pipe. The handling of the dual drill pipe then followed procedures similar to conventional pipe handling. The dual drill pipe was handled efficiently in singles, and was also racked in stands into the derrick.


Fig. 7 . Prior to the drilling, the return pipes were individually adapted and inserted into conventional 5-in. drill pipe.

Liner drilling. Drilling with liner was difficult because of a failure in the under-reamer tool. The only available tool, suited for our application, was used elsewhere prior to the test. The failure implied that the under-reamer arms did not open the hole to the required size. Drilling engineers decided to stop when the liner was drilled about 20 m into the new section. The liner was then expanded to hang in the 10¾-in. casing and released from the drilling BHA. After liner release, the drillstring was pulled to the surface, leaving the 85 m long liner section downhole as planned. 

Tool performance. The top-string adapter worked without any problems throughout the test period. The sliding piston showed excellent performance. The results indicate that 30 bar of backpressure gives about an extra 10 tons on the hook. The hook load increase represents a hydraulic force provided by the sliding piston, which can be converted into a downhole thrust force. The large potential and capacity for hydraulic WOB was thus proven. 

The dual float was subjected to an extensive test program in the laboratory. The tool experienced a leakage during the first part of the tests, due to a failure in the opening procedure. However, the tool was repaired and performed according to specifications during the rest of the trials. The tool has proven to be efficient for downhole pressure control. 

The liner expander performed well in several tests and the combination of the liner expander and the sliding piston proved to be a very efficient liner expansion system. The liner coupling also showed good performance during the trials. After pulling out of hole, the liner coupling was in good condition, and the primary mechanism for liner release was proven. 

CONCLUSION 

The new drilling method was successfully proven during the verification program, demonstrating that the sliding piston provides weight-on-bit by hydraulic means and prevents loss of the annular well fluid. Hole cleaning was efficient and could transport large cuttings in the returns. Gain/loss volumes of less than 1:100 were rapidly detected. Downhole well isolation was good and only small pressure fluctuations occurred during pipe connections. Drilling with liner was shown to be feasible, including liner hanger expansion and release from the liner after drilling. 

All components of the drilling system have proven acceptable performance. The verification program was challenged by a hole diameter less than planned, due to an improperly working under-reamer. This issue will be solved in future applications. 

The verification program has confirmed the practical application of this new drilling method. It also has large potential for MPD, for challenging pressure zones and depleted reservoirs. The method also has special features for extended-reach drilling and for deepwater applications. The next step is to demonstrate the method for deeper drilling in an onshore well.

關(guān)鍵字: drilling drill 
關(guān)于我們 | 會員服務(wù) | 電子樣本 | 郵件營銷 | 網(wǎng)站地圖 | 誠聘英才 | 意見反饋
Copyright @ 2011 CIPPE.NET Inc All Rights Reserved 全球石油化工網(wǎng) 版權(quán)所有 京ICP證080561號
国产精品国产三级国产普通话99| 国产亚洲精品中文字幕| 国内精品久久国产| www.亚洲天堂.com| 26uuu另类欧美亚洲曰本| 国产精品久久不卡| 天天射综合网视频| 黑人巨茎大战欧美白妇| 黄色亚洲网站| 国产欧洲精品视频| freexxxx性特大另类| 欧美久久久一区| 亚洲国产成人精品一区二区三区| 国产视频视频一区| 亚洲AV成人无码精电影在线| 国产婷婷精品| 天天色综合天天色| 在线日韩一区| 少妇熟女一区二区| 久久精品黄色| 国产一区二区不卡视频| 污视频免费在线观看| 国产不卡一区二区在线播放| 日韩精品123| 久久精品成人动漫| 免费wwwxxx| 91精品国产综合久久婷婷香蕉| 色婷婷中文字幕| 亚洲午夜一区二区三区| 国产成人自拍偷拍| 国产婷婷一区二区| 国产精品成人网站| 成人午夜av影视| 任我爽在线视频| 最新亚洲伊人网| 91免费国产视频网站| av男人的天堂av| 美女黄色成人网| 在线观看网站黄| 在线观看免费一区二区| 久草综合在线观看| 你懂的视频欧美| 欧美性视频在线播放| 亚洲免费一区| 欧美一级二级三级| 伊伊综合在线| 国产精品成人观看视频免费| а√天堂8资源在线| 91在线色戒在线| 岛国中文字幕在线| 国产精自产拍久久久久久蜜| 在线观看av的网站| 国产成人久久精品| 成年人视频在线看| 欧美伊久线香蕉线新在线| 视频二区在线| 韩国欧美亚洲国产| 日本又骚又刺激的视频在线观看| 欧美激情一二区| 手机福利小视频在线播放| 欧美国产日韩一区| 在线中文av| 欧美激情精品久久久久久蜜臀| 中文字幕在线视频免费观看| 欧美激情国产日韩精品一区18| 一个人免费观看视频www在线播放 一个人免费视频www在线观看 | 6080午夜伦理| 国产日韩影视精品| 在线永久看片免费的视频| 中文字幕一区二| 国产精品无码天天爽视频| 亚洲成人av一区| 午夜激情在线视频| 欧美日韩不卡视频| 国产porn在线| 精品亚洲国产成av人片传媒 | 18成人免费观看视频| 久久久久亚洲AV成人网人人小说| 国产精品毛片| 欧美狂猛xxxxx乱大交3| 国产一区二区不卡老阿姨| 欧美国产日韩在线观看成人| 99精品一区二区三区| 丰满人妻老熟妇伦人精品| 亚洲精品国产视频| 黄色av一区二区三区| 欧美视频在线一区二区三区 | 美女把尿口扒开给男人桶视频| 欧美精品精品一区| 日日爱66.cn| 中文字幕成人精品久久不卡| 亚洲国产精华液| 国产成人鲁鲁免费视频a| 国产精品论坛| 亚洲国产精品一区二区第四页av | 欧美日韩视频| 日本丰满少妇裸体自慰| 国产成人综合亚洲网站| 男人日女人网站| 亚洲大片精品永久免费| www久久com| 亚洲国产一区二区三区在线观看| 毛片一级免费一级| 欧美亚洲视频一区二区| 久久99亚洲网美利坚合众国| 日本在线播放不卡| 日本在线中文字幕一区| 天堂av8在线| 日韩av在线免费观看不卡| 成年人免费观看视频网站| 成人h精品动漫一区二区三区| 一级一级黄色片| 一本大道久久a久久综合| 性生活视频网站| 久久好看免费视频| 毛片免费不卡| 欧美精品亚洲精品| 香蕉久久夜色精品国产更新时间| 一级片免费在线观看视频| 狠狠色狠狠色综合日日91app| 啦啦啦免费高清视频在线观看| 亚洲成人自拍网| 国产高清视频网| 久久精品电影网| 秋霞a级毛片在线看| 美国av一区二区三区 | 在线观看17c| 欧美精品色网| 日韩精品电影一区二区三区| 欧美—级在线免费片| 国产88在线观看入口| 国产丝袜一区二区| 黄色小视频在线观看| 国产精品三区www17con| 精品福利一区| 性一交一黄一片| 不卡的av中国片| 性猛交xxxx乱大交孕妇印度| 亚洲成人xxx| 日本福利午夜视频在线| 狠狠久久综合婷婷不卡| 久久av综合| free性中国hd国语露脸| 国产偷国产偷亚洲高清人白洁| 香蕉视频网站在线| 国产一区二区三区视频| 快射视频在线观看| 亚洲综合视频一区| 午夜精品久久99蜜桃的功能介绍| 自拍偷拍第9页| 亚洲无人区一区| 成年网站免费观看| 国产精品成人一区二区| 久久99成人| 四虎成人免费视频| 日本一区二区在线不卡| 男人精品网站一区二区三区| 久久99国产精品自在自在app | 成人欧美精品久久久久影院| 久久久人成影片一区二区三区观看| 一区二区三区短视频| 不卡影院一区二区| 国产精品一区在线观看乱码| 亚洲精品无amm毛片| 中文字幕亚洲精品| 国产va在线视频| 亚洲中文字幕无码不卡电影| 国产乱妇无码大片在线观看| 丰满人妻一区二区| 中文字幕在线日韩 | 成人福利在线看| 日韩在线视频观看免费| 在线观看不卡av| 精精国产xxxx视频在线中文版| 久久婷婷人人澡人人喊人人爽| 欧美oldwomenvideos| 成人在线观看免费完整| 欧美日韩在线观看视频| av先锋影院| 国产精品一区二区久久国产| 一区视频网站| 一级少妇精品久久久久久久| 久久九九影视网| 欧美最猛黑人猛交69| 91成人在线播放| 亚洲精品伦理| 自拍偷拍激情视频| 国产精品第五页| 国产精品合集一区二区| 91精品国产99久久久久久| 日本国产一区| 成年人小视频在线观看| 国产精品视频一二| 国产精品久久久久久久久鸭 | 久草在.com| 欧美日韩大片一区二区三区| 欧美1区2区| 天堂网av手机版| 日韩一级黄色大片| 在线视频二区|