摘要:簡介:多分支井技術,對于氣藏開發來說,具有非常有價值的作用。多分支井完井能夠保證長期的產能增量。 This multilateral completion uses five-stage openhole packer syste...
簡介:多分支井技術,對于氣藏開發來說,具有非常有價值的作用。多分支井完井能夠保證長期的產能增量。


This multilateral completion uses five-stage openhole packer systems.
Although multilateral (ML) well technology is often thought of as a tool primarily for offshore use to capture outlying pockets of hydrocarbons, the majority of the installations have actually been on land in low-cost environments. Applying this technology has shown many benefits, but only in a few cases is ML technology used as the main field development technique. However, as operators look at lowering field development costs while increasing production, they are turning to ML wells as the solution.

ML completions provide excellent opportunities in unconventional gas developments. Two or more laterals off of a single vertical well bore can result in considerable cost savings and increased production. However, for maximum benefits, production from two or more laterals has to match or exceed the rates expected of the same number of vertical wells. And the design has to incorporate the ability to selectively re-enter and stimulate stages in each wellbore in order to enhance overall hydrocarbon recovery.

In April 2000, Baker Hughes deployed the first Level 6 ML stackable splitter system designed for fracturing gas wells. This system had 5.5-in. tubing/casing looking up with two 5.5-in. legs looking down. In this application, two of these systems were stacked so that there were three lateral well bores. To run into the well, it had to drift through 133⁄8-in. casing and be cemented in 121⁄4-in. open hole. It provided selective access and selective stimulation to all laterals up to 7,500 psi pressure differentials. At the time, the procedure lacked the commercial viability to become a mainstream field development technique; however, multilateral technology has continued to advance so that simple and reliable high-pressure junctions can now be applied in low-cost environments.

Recently, an operator of an unconventional gas play put the technology to the test. The challenges for the ML wells in the Granite Wash reservoir in the Texas Panhandle were:
• Full opening 41⁄2-in., 3.875-in. drift production in both laterals;
• Sealed isolated junction that could withstand 10,000-psi fracturing treatments (TAML level 4 junction);
• Mechanical integrity across the junction to support the formation;
• Capabilities for re-entry and restimulation of both laterals at a future date;
• Lower cost as compared to two single wells; and
• Positive production results.



The HOOK Hanger (in blue) is latched into the key seat of a window cut in the casing. (Figures courtesy of Baker Hughes)

Baker Oil Tools Frac-HOOK and Frac-Point systems were chosen for the task as these systems do not require many additional trips to install. The Frac-HOOK ML casing fracturing system comprises a HOOK Hanger ML junction that provides mechanical support at the junction window and re-entry capabilities to all laterals. It has an extensive history of being used in TAML Level 3-5 completions at inclinations ranging from 0° to 90° and at junction depths at more than 14,000 ft (4,270 m). To obtain a high-pressure seal at the junction, a ZXP liner top packer is used as an integral part of the HOOK Hanger. Lateral and mainbore diverters are used to selectively fracture the formation as well as for future re-entry capabilities.

The system provides for one-trip deployment: The HOOK Hanger, with a lateral drilling diverter or lateral re-entry diverter pre-installed, is run as part of the lateral liner installation. Either of these diverters allows setting of bridge plugs and for perforating and fracing below the hanger in the lateral while maintaining pressure integrity across the hanger window. The mainbore fracing diverter allows similar functionality, but for the main bore. These diverters can be deployed with threaded pipe, coiled tubing, or a snubbing unit.

The Frac-Point system (liner top packer, openhole packers, frac sleeves, wellbore isolation valve, and pressure-actuated sleeves) allows completion of the well without cementing and perforating in the producing interval. Openhole packers provide isolation along the length of the liner, eliminating the need to cement the liner in the lateral section and increasing formation interface. They also eliminate the need for perforating because sleeves provide access to the zone of completion for both fracturing and production. Fracture treatments for each section can be pumped on the same day, eliminating the expense of mobilization and demobilization of pumping equipment. The system provides better fracture extension control than nonselective hydraulic fracturing, resulting in improved initial productivity and accelerated reservoir drainage.


The basic installation process for the well was:
• Drill main bore;
• Run Frac Point completion system in the mainbore lateral;
• Set whipstock above the lower completion, sidetrack the well, and drill the upper lateral;
• Retrieve whipstock from the well;
• Make up the upper system below the HOOK Hanger and run everything into the well, landing the hanger in the window;
• Fracture the lower lateral;
• Fracture the upper lateral; and
• Achieve commingled flow.

The design for the openhole packer system would use the following sizing:

Use Hole Size Casing Size To 12,000 ft (3,660 m) 97⁄8 in. 75⁄8 in.

In laterals 61⁄8 in. 41⁄2 in.

This particular well was drilled on a pad that also had an offsetting single-lateral well that needed stimulation. Therefore, the plan was to stimulate the bottom lateral of the ML and then rig over and stimulate the single-lateral well. While that well was being treated, the diverters on the ML were switched simultaneously. Once the single-lateral offset well was completed, the pumping crews would switch back to treat the upper lateral of the ML. This saved the operator mobilizing charges for the pumping crews and maximized potential savings on all three laterals, which were stimulated in the course of one week. Both laterals were completed using five-stage openhole packer systems (Figure 1). Both laterals are now open and producing.

Results

The hanger system delivered two installed, stimulated, and producing laterals. The Frac-Point systems were run to total depth, and pressure integrity was maintained during all stimulation operations. The production results from the well met or exceeded expected results from offsetting wells. The cost savings were realized over drilling and completing two separate wells. The drilling cost proved to be 15% to 20% less, and the completion costs were nearly 50% cheaper than the average for stimulating two separate laterals. This reflects the cost savings captured by performing consecutive pumping operations on the pad without mobilizing and demobilizing pumping crews.

This well demonstrates the strong economic potential of ML completions in unconventional gas developments. Operators can save capital investment by accessing production from two laterals while drilling a single vertical well bore. Greater drainage access across a section is also possible by using this technology.

Maximizing production in the future

Hydraulically fractured ML gas wells have gained significant acceptance in the North American market, and the technology is moving into the international arena.

Baker Hughes completed a similar installation technique in Africa recently. The expected production result was 15 Mcf/d, but the production came in at 85 Mcf/d.

Although these results are not typical, it should not take long to gain acceptance on a global scale if success stories yield a five-times-greater production increase.

Currently, a North American gas well using two HOOK Hanger systems with three lateral legs is being completed and should realize an additional 15% to 20% savings over a single Hook Hanger deployment. Depending on the reservoir, as more lateral legs are added, the hydrocarbon recoverable factor significantly increases due to maximum reservoir exposure and more efficient well spacing and subsequent drainage.

Baker’s current pressure limit for ML equipment used in well fracturing is 10,000 psi. The future will easily push this limit, with formations being evaluated where the application of this technology could be 12,500 psi and possibly even 15,000 psi differentials.

Reservoir prediction models will have to be honed and improved to stay up with the results seen in the field. Well monitoring and intelligent production systems will begin to play a significant roll in multilateral completion techniques to maximize production, improve models to better understand reservoir drainage, and to minimize water production. 

楊寶劍 是振威(全球)石油網的高級技術編輯,在石油技術資訊行業有八年的學識和經驗。他源源不斷地提供石油行業全球最新的技術創新、研發成果、現場應用情況等信息。如果你對“新技術新產品”的內容有任何問題或建議,請聯系楊寶劍編輯 +86 10-58236512 Email:allenyo@zhenweiexpo.com 歡迎您提供手中的最新技術文章!
關鍵字: 多分支井 
關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
Copyright @ 2011 CIPPE.NET Inc All Rights Reserved 全球石油化工網 版權所有 京ICP證080561號
欧美精品一区二区视频 | 麻豆自创视频在线观看| 在线观看日韩精品| 国产偷人爽久久久久久老妇app | 黄色一级视频免费看| 国产高清久久久| 9.1成人看片| 国产精品激情| 男女av免费观看| 国产成人在线中文字幕| 欧洲一区二区在线观看| 国产无遮挡裸体视频在线观看| 国产精品www| 欧美白人做受xxxx视频| 久久影视免费观看| 免费男女羞羞的视频网站中文版 | 自拍偷拍99| 户外露出一区二区三区| 亚洲专区在线视频| 免费在线观看av| 2021国产精品视频| 中午字幕在线观看| 久久精品国产清自在天天线 | 国产亚洲午夜| 在线一区二区不卡| 国产精品不卡| 日韩免费毛片视频| 在线日本制服中文欧美| www.国产亚洲| av综合网站| 中文字幕乱码一区二区三区| 国产亚洲人成a在线v网站| 精品久久精品久久| 成av人片在线观看www| 成人精品一区二区三区电影黑人| 91女主播在线观看| 国产99久久精品一区二区| 精品影院一区| 91精品国产成人| 少妇性bbb搡bbb爽爽爽欧美| 欧美激情视频网站| 亚洲嫩模一区| 久久男人资源视频| 天堂√在线中文官网在线| 欧美成人四级hd版| 91短视频在线观看| 欧美黑人巨大精品一区二区| 久草在线免费福利| 超碰97人人做人人爱少妇| 1024在线视频| 欧美精品久久久久久久免费观看| 最后生还者第二季在线观看| 欧美激情精品久久久久久蜜臀 | 精品国产电影一区二区| 国内精品免费一区二区三区| 欧美一区二区三区免费观看视频 | 欧美日韩一二三| 1069视频| 91麻豆精品国产| 国产xxxxxx久色视频在| 亚洲成人黄色网址| 德国极品另类| 中文字幕欧美在线| 最新中文字幕av专区| 欧美激情videos| 九九在线视频| 国产精品久久久久福利| 日韩精品亚洲人成在线观看| 成人av免费看| 欧美暴力调教| 亚洲日本精品国产第一区| 亚洲不卡在线| av动漫在线看| 在线成人直播| 精人妻一区二区三区| 日韩成人午夜精品| 国产精品视频在| 成人三级伦理片| 在线能看的av| 亚洲精品亚洲人成人网| 国产精品爽爽久久久久久| 五月婷婷激情综合| 色偷偷av男人的天堂| 欧美一卡二卡三卡| 爱爱视频网站免费| 久久视频国产精品免费视频在线| 一级二级三级在线观看| 国产精品电影一区| av日韩中文| 久久riav二区三区| 永久免费精品视频| 中国丰满人妻videoshd| 欧美三级小说| xxxx日本免费| 成人a区在线观看| 91黑人精品一区二区三区| 亚洲国产成人精品视频| 最近中文av字幕在线中文| 欧美成人福利视频| 3344永久| 日本sm极度另类视频| 99色在线观看| 亚洲在线播放电影| 国产真实有声精品录音| 日本黄色三级网站| 精品一区二区三区免费| 国产欧美一区二区三区在线看蜜臂| 一区二区三区免费| 欧美毛片又粗又长又大| 日韩精品丝袜在线| 少妇精品放荡导航| 91精品国产综合久久香蕉最新版 | 欧美日韩性生活片| 亚洲手机在线| 992在线观看| 国产精品嫩草久久久久| 色窝窝无码一区二区三区| 精品乱人伦一区二区三区| 激情婷婷丁香| 国产精品旅馆在线| 日韩精品一区二区三区av| 大陆av在线播放| 亚洲精品123区| 欧美一区免费观看| 亚洲三级电影全部在线观看高清| 最新中文乱码字字幕在线| 亚洲精品永久免费| 国产三区四区在线观看| 国产一区二区视频在线免费观看| 精品五月天堂| 四川一级毛毛片| 国产黑丝在线一区二区三区| 在线视频播放大全| 欧美放荡的少妇| 婷婷六月激情| 91日本视频在线| 9999久久久久| 乳色吐息在线观看| 成人综合在线观看| 国产免费不卡视频| 精品国精品国产尤物美女| 在线免费国产| 国产中文一区二区| 亚洲精品进入| 黄色国产在线观看| 亚洲国产精品av| 欧美**室bdsm视频| 欧美噜噜久久久xxx| 男女免费观看在线爽爽爽视频| 中文字幕在线亚洲三区| 亚洲无线视频| 日韩网红少妇无码视频香港| 在线观看亚洲专区| 日本一二区视频| 超碰在线97av| 国产一区二区三区四区大秀| 亚洲午夜久久久久久久国产| 亚洲欧美日韩一区二区| 69欧美性猛交| 欧美主播福利视频| 99综合99| 香蕉视频1024| 久久精品一区八戒影视| 亚洲国产综合久久精品小蝴蝶| 久热精品视频在线观看一区| 密臀av在线播放| aa免费在线观看| 国产美女在线观看一区| 国产巨乳在线观看| 日韩久久精品成人| 成人三级网址| 免费人成自慰网站| 人人爽香蕉精品| 国产又粗又猛又爽又黄视频| 亚洲激情久久久| 超碰在线免费公开| 日本人体一区二区| 蜜桃一区二区三区在线观看| 一级片一区二区三区| 亚洲大胆美女视频| 日本不卡在线| 日韩一级性生活片| 国产在线日韩欧美| 日本美女一级视频| 久久中文字幕在线视频| 日韩免费小视频| 成人日韩在线视频| 久久亚洲精精品中文字幕早川悠里| 欧美精品se| 欧美重口另类videos人妖| 2020最新国产精品| 无码熟妇人妻av| 夜夜嗨av一区二区三区| 男裸体无遮挡网站| 国产精品免费一区二区三区观看| 欧美激情极品| 国内毛片毛片毛片毛片毛片| 在线欧美日韩国产| 你懂的视频在线播放| 亚洲永久一区二区三区在线|