国产娇喘精品一区二区三区图片_国产无人区一区二区三区_欧美性猛交一区二区三区_一区二区欧美在线

導航:全球石油化工網 >> 資訊頻道 >> 技術裝備

延伸張力腿平臺在墨西哥灣安裝(英)

[加入收藏][字號: ] [時間:2010-01-12 全球石油網 關注度:0]
摘要:簡介:可擴展式張力腿平臺(ETLP)將在墨西哥灣殼牌的大足油田安裝,該油田由雪佛龍在2006年一月所發現,水深5330英尺(1615米),大約在新奧爾良南362公里,距雪佛龍大溪地油田56公里。 The extended tension ...

簡介:可擴展式張力腿平臺(ETLP)將在墨西哥灣殼牌的大足油田安裝,該油田由雪佛龍在2006年一月所發現,水深5330英尺(1615米),大約在新奧爾良南362公里,距雪佛龍大溪地油田56公里。

The extended tension leg platform (ETLP) will see its deepest installation to date if it goes to work as anticipated on Shell’s Big Foot field in the Gulf of Mexico (GoM). Big Foot, which was discovered by Chevron in January 2006, lies in 5,330 ft (1,615 m) water depth on Walker Ridge Block 29, roughly 225 miles (362 km) south of New Orleans and 35 miles (56 km) south of Chevron’s producing Tahiti field.

Pushing the limits

The ETLP is not a new design. It was conceived at Han-Padron Associates (HPA) in 1996 and was based on lessons learned from the design of five TLPs for the GoM.

ABB acquired HPA and the ETLP technology in 1998 and filed for a patent two years later, securing the patent in 2002. Since 2005, FloaTEC LLC, a joint venture between Keppel FELS and J. Ray McDermott, has owned the rights to the design.


           The ETLP design is being improved to work at greater depths in the GoM. (Images courtesy of FloaTEC)

Tension leg platforms (TLPs) historically have been limited to working in around 5,000 ft (1,524 m) water depth because of the challenges associated with tendon design and installation.

The deepest TLP installation to date is Magnolia in Garden Banks blocks 783 and 784 approximately 180 miles (290 km) south of Cameron, La., Conoco developed the field with an ETLP in 2004. The unit is working in 4,700 ft (1,432 m) water depth, and at the time of its installation, displaced the record-holding Marco Polo TLP by 390 ft (120 m).

Though the record-setting installations have been in the GoM, TLPs are not restricted to working there. A number of ETLPs are deployed around the world, including those working for ExxonMobil on the deepwater Kizomba A and Kizomba B projects offshore Angola.

Present plans

Chevron’s objective for Big Foot is to develop the field with a dry-tree floating drilling and production facility.


             Technology advancement continues to push TLPs into deeper water.

In early December 2009, the operator awarded front-end engineering work to FloaTEC. FloaTEC is to provide the hull, which will be based on the company’s proprietary ETLP, with associated foundation piles, tendon mooring systems, and top tensioned risers.

FloaTEC will provide engineering and project management services to develop the platform hull design, specify the required marine systems equipment, and optimize the hull, tendons, and risers global design, which includes carrying out the necessary structural analyses. The company also will assist Chevron in estimating the cost of the facility and planning the subsequent phases of the development.

Improving the TLP design

In a move to make the TLP a possible candidate for these deepwater projects, the original designers at Han-Padron identified low-risk configuration changes to the conventional TLP to obtain a highly efficient platform that translate into cost savings. Today, FloaTEC is introducing new design innovations.

Dr. John Murray, director of technology at FloaTEC, said the company is expanding the TLP technology to increase water depth capability. “By doing this, we can offer a wider range of products to the deepwater industry.”

The original patent addressed moving the columns of the platform inboard and extending the pontoons to the tendon porch, which cuts down on the span between the columns while providing the same restoring effects from the tendons as the conventional TLP design. Decoupling the column spacing from tendon spacing reduces the amount of structural steel required for the hull, which in turn reduces the cost.

“This idea takes advantage of a broad base between tendon porches, while reducing the span of the steel supporting the topsides, resulting in a more efficient hull design,” Murray said.

The primary goal was to reduce the weight of the platform, which would also lower the construction cost and the overall platform size. Design changes resulted in more than 40% steel weight savings in the deck and hull while allowing greater payloads to be carried into deeper water. The smaller hull also requires fewer tendons.

Another improvement aims to extend the water depth capability, which would make the ETLP a candidate for fields in water depths that were previously restricted to deepwater floaters such as spars and semisubmersibles.

“In the last three decades, water depth capability has grown by 3,000 ft (915 m) per decade,” Murray said. “We are providing new steel tendon designs that take advantage of experience gained from all deepwater designs. By applying improved engineering methods and materials, engineers have made advances in tendon design that will allow the ETLP to be deployed at greater depths than ever before.”

While these modifications were being made, it was critical to preserve the functionality of the system as well as its constructability. Engineers had to maintain the ability to lift or mate the deck with the hull and to carry out integration and commissioning at quayside or near shore. The compact hull form suits a number of construction methods and options including near-shore or quayside deck/hull integration and commissioning, which reduces offshore installation time, eliminates the need for lengthy transports, and reduces risk.

Design benefits

One advantage of the ETLP is that it has very high structural efficiency, particularly in regions more benign than the GoM.

“The environmental forces on the hull and tendon system are more demanding in the Gulf of Mexico than in most other operating environments in the world,” Murray said. “So in regions such as West Africa, where the environment is more benign, we can further reduce the span between the columns and improve the efficiency of the hull even more.”

Smaller versions of the ETLP offer even greater savings by reducing the number of columns from four to three.

“This design would be an option for wellhead platforms or in cases where there is a requirement for small topsides payload,” Murray explained.

The TLP is one of a few proven floater solutions that can support dry-tree risers. A dry tree completion approach allows a much higher level of reservoir management and productivity. “Part of the reason for this is the ease of intervention with the TLP,” Murray said.

Another advantage of the ETLP is that it does not require deep water at quayside for construction. “These systems can be built in yards all over the world,” Murray said, “and the simplified construction allows a high level of in-country participation.” A further construction benefit is a significant reduction in delivery time. Offshore risk mitigation and cost savings also can be factored into the equation because the ETLP can be fully integrated and commissioned near shore or at quayside. And robustness and safety aspects of the ETLP are equivalent to the conventional TLP.

FloaTEC’s basic design includes full production and drilling capabilities as well as quarters for onboard personnel. The production unit is fully self-contained and is designed to export fluids to a pipeline or floating storage and offloading vessel.

Other opportunities for ETLP technology include those where activity is restricted to drilling (no production), tender-assisted drilling, and in wet-tree production applications.

Ongoing technology development efforts are aimed at further reducing cost, extending the limits of the ETLP’s application, and broadening construction flexibility. 

關鍵字: 張力腿平臺 
關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
Copyright @ 2011 CIPPE.NET Inc All Rights Reserved 全球石油化工網 版權所有 京ICP證080561號
午夜久久福利| 久久要要av| 99蜜桃在线观看免费视频网站| 欧美高潮视频| 亚洲精品自在久久| 欧美虐宫另类残忍视频| 亚洲一区二区精品视频| 亚洲欧美另类在线视频| 成人午夜视频在线观看| 国产福利视频在线播放| 亚洲日本va| 日韩一区不卡| 美女18一级毛片一品久道久久综合| 国产精品自产拍高潮在线观看| 日色在线视频| 欧美精品在线视频观看| 最近久乱中文字幕| 日韩精品免费视频| 自拍视频网站| 欧美一区二区播放| 男人的天堂av社区在线| 午夜视频久久久久久| 国产永久免费视频| 中文字幕巨乱亚洲| 黄色一级片免费看| 99国产欧美另类久久久精品| 国产成人在线网址| 麻豆91小视频| 色无极影院亚洲| 丝袜亚洲另类丝袜在线| 亚洲天堂2024| 亚洲影音一区| 日本天堂在线播放| 国产视频久久| 欧美夫妇交换xxx| 免费久久99精品国产自在现线| wwwxxxx在线观看| 欧美涩涩网站| 91丨porny丨九色| 激情久久久久久| 999在线精品视频| 欧美激情成人在线| 色婷婷激情视频| 在线观看国产精品入口| 日韩va在线观看| 欧美日韩中文| 国产成人av片| 久久久久国产精品午夜一区| 亚洲少妇18p| 久久不射中文字幕| 国产呦小j女精品视频| 日本不卡一区二区三区| 韩国女同性做爰三级| 免费人成精品欧美精品| 一区二区三区伦理片| 久久99日本精品| 影音先锋男人资源在线观看| 国产乱码字幕精品高清av| 永久免费看mv网站入口| 国产aⅴ综合色| 久久国产精品波多野结衣| 91在线云播放| 欧美在线观看不卡| 中文字幕一区二区三区视频| 91美女精品网站| 亚洲成年人影院| 日本免费不卡视频| 欧美无人高清视频在线观看| 欧美性猛交ⅹxxx乱大交免费| 日韩午夜激情免费电影| 人人在草线视频在线观看| 亚洲精品一区二区在线| 91骚色在线| 欧美日韩爱爱视频| 自拍视频在线| 91在线免费网站| 欧美电影免费观看网站| 午夜午夜精品一区二区三区文| 永久免费精品视频| 男人添女人下面高潮视频| 五月精品视频| 91九色蝌蚪porny| 久久99精品国产麻豆不卡| 丝袜美腿小色网| 国产无一区二区| 国产露脸国语对白在线| 日韩欧美在线一区| 国内一区二区三区精品视频| 日韩精品视频在线观看网址| 免费av播放| 国内揄拍国内精品| 美女羞羞视频在线观看| 国产精品嫩草在线观看| 亚洲日韩中文字幕一区| 大荫蒂性生交片| 国产精品成人av| 国产伦精品一区二区三区精品| 国内精品在线播放| 久久精品国产亚洲AV无码男同 | 久久久久久9999| 亚洲综合免费视频| 在线观看免费成人| 日本三级电影网站| 久久国产精品久久久久久| 午夜视频成人| 国产一区自拍视频| 福利电影一区| 亚洲久久中文字幕| 美女性感视频久久| 尤物视频在线观看国产| 亚洲成人一区在线| 国产激情网址| 久久福利网址导航| a级片国产精品自在拍在线播放| 精品一区日韩成人| 香蕉久久夜色精品国产使用方法 | 国产一本一道久久香蕉| 国产伦精品一区二区三区视频网站| 精品magnet| 一个人看的日本www的免费视频| 久久久999国产精品| 久久久久久久久免费视频| 欧美日韩无遮挡| 国产一区二区三区四区二区| youjizz.com日本| 不卡一区二区在线| 国产人妖一区二区三区| 日韩欧美一级二级三级| bdsm精品捆绑chinese女| 91精品国产综合久久久久久蜜臀 | 日本不卡一二三区| 精品视频97| 醉酒壮男gay强迫野外xx| 久久久亚洲高清| 亚洲女人天堂a在线播放| 日韩电影中文字幕一区| 九色在线播放| 国模精品一区二区三区| 夜夜春成人影院| 亚洲最大的黄色网| 欧美国产在线观看| 99久9在线视频| 色妞欧美日韩在线| 欧美大片黄色| 国产 欧美 日本| 亚洲精品日韩久久| 久久高清无码视频| 色网站国产精品| 成人3d漫画免费无遮挡软件| 91精品久久久久久久久久久久久| 国产麻豆精品| 波多野结衣在线免费观看| 99视频精品全部免费在线| 天堂在线观看免费视频| 一区二区三区 在线观看视| 米奇精品一区二区三区| 中国黄色录像片| 国产欧美午夜| 国产伦精品一区二区三区视频网站| 欧美精品乱人伦久久久久久| 国内精品卡一卡二卡三新区| 国产精品一区二区免费| 欧美肉体xxxx裸体137大胆| 少妇的滋味中文字幕bd| 亚洲国产精品一区二区久久| 黄色动漫网站| 国产日韩专区在线| 超碰成人在线观看| 亚洲av无码一区二区三区网址| 中文字幕精品三区| 18free性欧美另类hd| 欧美一级视频免费在线观看| 国产精品一区二区精品视频观看| 男人的天堂免费| 日本一区二区三区dvd视频在线| 九九热爱视频精品视频高清| 午夜美女久久久久爽久久| 高清在线一区二区| 亚洲av无码专区在线播放中文| 国产三级精品在线| 国产免费自拍视频| 日韩美女视频免费在线观看| 亚洲一区二区三区日本久久九| 久久偷拍免费视频| 亚洲自拍欧美精品| 97dyy97影院理论片在线| 国产日韩亚洲精品| 欧美在线黄色| 欧美精品一二三四区| 亚洲国产高清福利视频| 超碰在线免费公开| 青青在线视频观看| www.亚洲激情.com| 国内国产区免费视频| 国产成人鲁鲁免费视频a| 国偷自产av一区二区三区| 三年中国中文观看免费播放| 欧美日韩亚洲精品一区二区三区 | 久久国产精品久久国产精品| 国产电影一区二区三区爱妃记|