<ul id="k48q0"><dfn id="k48q0"></dfn></ul>
<tfoot id="k48q0"><delect id="k48q0"></delect></tfoot>
<strike id="k48q0"></strike><del id="k48q0"><tfoot id="k48q0"></tfoot></del>
  • <ul id="k48q0"></ul>
  • 導(dǎo)航:全球石油化工網(wǎng) >> 資訊頻道 >> 技術(shù)裝備

    墨西哥灣深水水平井鉆井平臺起火沉沒事故

    [加入收藏][字號: ] [時間:2010-05-27 博研論壇 關(guān)注度:0]
    摘要:   You may have heard the news in the last two days about the Deepwater Horizon drilling rig which caught fire, bur...


      You may have heard the news in the last two days about the Deepwater Horizon drilling rig which caught fire, burned for two days, thensank in 5,000 ft of water in the Gulf of Mexico.  There are still 11 men missing, and they are not expected to be found.  
    The rig belongs to Transocean, the world’s biggest offshore drilling contractor.  The rig was originally contracted through the year 2013 to BP and was working on BP’s Macondo exploration well when the fire broke out.  The rig costs about $500,000 per day to contract.  The full drilling spread, with helicopters and support vessels and other services, will cost closer to $1,000,000 per day to operate in the course ofdrilling for oil and gas. The rig cost about $350,000,000 to build in 2001 and would cost at least double that to replace today.


    Nautilus, being transported on a Heavy-Lift vessel


      The rig represents the cutting edge of drilling technology.  It is a floating rig, capable of working in up to 10,000 ft water depth.  The rig isnot moored; It does not use anchors because it would be too costly and too heavy to suspend this mooring load from the floatingstructure.  Rather, a triply-redundant computer system uses satellite positioning to control powerful thrusters that keep the rig on station within a few feet of its intended location, at all times. This is called Dynamic Positioning.
    The rig had apparently just finished cementing steel casing in place at depths exceeding 18,000 ft.  The next operation was to suspend the well so that the rig could move to its next drilling location, the idea being that a rig would return to this well later in order to complete the work necessary to bring the well into production.
    It is thought that somehow formation fluids – oil /gas – got into the wellbore and were undetected until it was too late to take action.  With a floating drilling rig setup, because it moves with the waves, currents, and winds, all of the main pressure control equipment sits on the seabed – the uppermost unmoving point in the well. This pressure control equipment – the Blowout Preventers, or ‘BOP’s” as they’re called, are controlled with redundant systems from the rig.  In the event of a serious emergency, there are multiple Panic Buttons to hit, and even fail-safe Deadman systems that should be automatically engaged when something of this proportion breaks out.  None of them were aparently activated, suggesting that the blowout was especially swift to escalate at the surface.  The flames were visible up to about 35 miles away.  Not the glow – the flames.  They were 200 – 300 ft high.
     

    上一頁12345下一頁
    關(guān)于我們 | 會員服務(wù) | 電子樣本 | 郵件營銷 | 網(wǎng)站地圖 | 誠聘英才 | 意見反饋
    Copyright @ 2011 CIPPE.NET Inc All Rights Reserved 全球石油化工網(wǎng) 版權(quán)所有 京ICP證080561號
    免费看国产精品3a黄的视频| 精品一区精品二区制服| 日韩精品一区二区三区毛片| 99er热精品视频| avtt天堂网久久精品| 久久久久99精品成人片试看| 久久精品国产一区| 中文字字幕在线精品乱码app| 日韩精品视频在线观看免费| 在线观看日韩精品| 日韩亚洲国产二区| 国产精品无码av天天爽 | 内射中出日韩无国产剧情| 国产愉拍精品手机| 在线精品视频一区二区| 2021久久精品免费观看| 精品国产一区二区三区色欲| 久久99精品久久只有精品| 日韩人妻精品一区二区三区视频| 亚洲国产精品一区第二页 | 国内精品伊人久久久久AV影院| 精品国产高清在线拍| 九九精品国产99精品| 精品香蕉伊思人在线观看| 日韩中文字幕在线观看| 亚洲 日韩 色 图网站| 亚洲日韩激情无码一区| 亚洲AV日韩AV高潮无码专区| 亚洲人午夜射精精品日韩| 日韩一区精品视频一区二区| 日韩免费高清大片在线| 日韩视频在线精品视频免费观看| 日韩AV高清无码| 日韩精品免费一级视频| 精品96在线观看影院| www.午夜精品| 久久精品国产99国产精品| 中日韩产精品1卡二卡三卡| 国产精品无码午夜福利| 久久精品视频一区| 99久久精品国产片久人|