First conceived as alternatives to costly or technically difficult interventions, intelligent wells that can be monitored and controlled remotely have evolved into a powerful reservoir management tool. As a result, after initially slow industry-wide uptake, their number is projected to increase fivefold in the next five years. 


At the heart of intelligent wells are surface-actuated downhole valves, used to regulate flow from individual zones or laterals, and permanent downhole temperature and pressure sensors. Today, downhole control valves range from those with simple on-off controls to hydraulically actuated and electrically controlled, infinitely variable-setting chokes. These innovations permit engineers to design valves that can be remotely adjusted within a range of cross-sectional flow areas matched to a zone’s production profile. Schlumberger now reports a 97% reliability rate for its second-generation valves.

While the initial objective of intelligent well technology?extending well life?was effective, that was not the most efficient use of the technology. Instead, the technology’s true promise, the industry has come to understand, is best realized when intelligent wells are used as a tool for maximizing reserves recovery. This change in intelligent well identity ? from intervention avoidance to reservoir management tool ? has been greatly enhanced by the emergence of robust downhole permanent pressure and temperature sensors capable of functioning in harsh environments for extended periods of time. Their new role has also been furthered by increased longevity, the result of more reliable electrical connections that in the past had been a weak link in downhole electronics. Today, fully redundant, independently testable, mechanical and full-welded connectors and splices have delivered a step-change improvement in reliability.

Because of these new technologies, monitoring today includes much more than pressure and temperature data. Permanent downhole multiphase flowmeters, seismic sensors, and electrodes have been included to deliver formation imaging away from the well bore, and they are all being connected through control centers that facilitate almost instantaneous responses to changing conditions. Data from these intelligent completions are also used to continually enhance and update production models and simulations, perform and interpret production tests on individual zones and laterals, predict sand and water encroachment, and measure flow rate and water cut.

Smart choice

The advantages of reservoir monitoring and control are obvious. For example, since wells seldom cross only a single hydrocarbon-bearing zone, completion engineers are often forced to decide between commingling production from multiple zones and producing each zone sequentially. Historically, producing more than one zone at a time has been an option only when the zones are of compatible pressure and fluid composition, and no regulatory concerns exist. Two, three, and sometimes four perforated intervals also can be produced at the same time through completions in which each zone is mechanically isolated from the others and flowed to the surface through separate production strings.

Sequential production typically requires flowing one zone to its economic limit before plugging and abandoning it in order to move up the hole to complete the next zone.

This cycle is then repeated until all zones have been depleted. In almost all cases, this strategy leaves behind considerable reserves and results in poor production profiles because of extended periods of depletion within each zone.

In contrast, using intelligent completions in a sequential production scheme, which involves opening and closing each zone remotely from the surface, improves production by eliminating both intervention costs and poor production profiles. Variable-setting valves can also be used to eliminate sequential production in favor of commingling by managing flow from high-pressure zones to prevent crossflow.

This does not mean that intelligent completion technology guarantees added value wherever it is applied. Experience has shown that the degree to which production is improved by intelligent completions depends on such factors as porosity and permeability distribution within that reservoir. The decision to use intelligent wells does not require every well in a smart field to be an intelligent completion. The operator must first ascertain that the reservoir type in a given field is suitable for intelligent well technology and then make a similar determination for each well planned for the field.

Candidate screening processes range from a simple analytical approach to complex reservoir models. Given such inherent uncertainties as reservoir characteristics, produced fluid composition, well performance, and recovery efficiency, it is important to use a stochastic rather than deterministic approach in the screening process.

Guiding parameters

General experience-based guides for choosing an intelligent well strategy have emerged over time. In a reservoir with uniform permeability, for instance, remotely actuated valves would seem, at first glance, to be an effective tool for managing water influx and therefore increasing well life and ultimate recovery. But if the completion is to be set across a relatively short interval within that reservoir, an intelligent completion may not be economically justified since a sufficiently uneven fluid front may not develop. In other words, the oil and water streams may not be sufficiently distinct to allow control of one fluid flow stream without affecting the other, and an intelligent completion would be a waste of money.

While intelligent completions can be effective in layered reservoirs, for obvious reasons they are decidedly more efficient when the shale zone separating the sands is continuous and the seal impermeable. Therefore, within the same layered reservoir, some wells crossing reliably sealed layers are well-served by intelligent completions.

One set of mathematical models developed for candidate screening uses reservoir simulation and well simulation techniques to generate a comparative model of the benefits of intelligent completions. Scenarios are created to generate variance in reservoir performance affecting the timing of events requiring intervention, reservoir monitoring, or reservoir management and are often driven by geological uncertainty and reservoir heterogeneity.

In heterogeneous channel reservoirs, the benefits of intelligent completions depend on well performance, which, in turn, depends on well placement with respect to the permeability of the formation and connectivity of the channels. That is because the effectiveness of flow control valves depends on choking, which is a function of high deliverability. By their nature, however, the majority of heterogeneous reservoirs benefit from intelligent completions since their varying permeability and porosity tend to create just the kind of fluid front that variable-setting valves can best exploit.

Team effort in Saudi Arabia

In 2004, Saudi Aramco engineers drilled and completed a maximum reservoir contact (MRC) well as a proof-of-concept project. The well is in the Haradh field, the designation given the southwest portion of Saudi Arabia’s giant Ghawar field. The Haradh area was brought on production in three successive increments over nearly 10 years from May 1996 to January 2006. While Increment I was developed using conventional completions wells, experience led Saudi Aramco engineers to eventually include MRC, multi-laterals, and intelligent completions in final Increments II and III.

The A12 well in the Haradh area was originally completed from a horizontally set, 7-in. line. A 61⁄2-in. horizontal openhole section was then drilled from the bottom of the liner and a 41⁄2-in. liner set across a section that had incurred heavy fluid losses during drilling of the main well bore. Two more 61⁄2-in. laterals were drilled from the 7-in. liner and left as “barefoot,” or openhole, completions.

With this standard multilateral completion, no water was produced initially, but in less than one year, water cut had reached about 23%. As a result, available drawdown and overall production were reduced and treatment and disposal costs rose, prompting the operator to deem water-production control imperative.

In response, Schlumberger designed and deployed an intelligent completion system with multiposition, downhole flow control valves and surface flow-rate measurements to selectively manage water production from each of the three zones. Through optimization of the downhole control valves, water cut was reduced from 23% to almost zero.

The successful application of intelligent wells to the Haradh field, as detailed in a paper presented at the 2007 International Petroleum Technology Conference, held in Dubai, was the result of a project-management approach to the design, planning and installation processes. Five Schlumberger segments teamed with the Saudi Aramco facilities, production, drilling and workover; reservoir management; and reservoir description departments. Schlumberger and Saudi Aramco’s reservoir management and reservoir description departments built a multilateral well model in PIPESEM production system analysis software to calculate pressures opposite each lateral at various water cuts. The simulation estimated lateral performance across the valves over a range of pressure and flow rates.

Prior to starting the project, more than 30 multidisciplinary team members from Schlumberger and Saudi Aramco participated in a two-day forum to plan the project, run the completion on paper, agree on the design criteria and running procedures, and define responsibilities. Participants jointly developed a list of 28 action items in an effort to ensure a trouble-free operation.

The field team consisted of a completions installation crew, a reservoir evaluation wireline crew, a coiled tubing crew, and a multiphase flow testing crew managed through the Schlumberger advanced completions project manager. In view of the well’s workover history and the possible presence of casing deformations capable of affecting intelligent completion installation, the reservoir evaluation wireline and well services segments ran a USI UltraSonic Imager corrosion log on coiled tubing. The run confirmed the integrity of the casing and the suitability of QUANTUM gravel pack and MultiPort bypass packers with multiple porting. Using a PhaseTester portable multiphase well production monitoring system and the InterACT real-time monitoring and data delivery system, the team optimized the intelligent completion performance. This enabled the

Saudi Aramco engineers at their offices in town to adjust downhole flow-control valve settings in real time to maximize oil production and minimize water cut. 

During equipment testing and installation, and subsequent flow testing of the well, each of the valves was actuated through more than 10 complete cycles?110 position changes, or the equivalent of several years of typical operation. The well was fully flow-tested and put on production with minimal water production. Saudi Aramco engineers reported at the 2007 IPTC meeting that without the intelligent well approach, the well would have watered out and ceased production.

Tubing- and wireline-retrievable flow control valves. These intelligent flow control valves, unlike their predecessors, do not require wireline or coiled tubing intervention to close, open, or infinitely adjust the flow area. Instead, they are remotely actuated through a hydraulic capillary tube (left) or, in the case of the electrical systems, through an electrical signal to electromechanical actuators (right). Both valves shown are tubing-retrievable.
相關(guān)技術(shù)裝備
2011-03-03 16:49:45 ·“膨脹套管完井修井關(guān)鍵技術(shù)”獲一等獎(jiǎng)
2010-12-29 10:55:22 ·勝利灘淺海無(wú)污染鉆完井液技術(shù)通過(guò)山東省成果鑒定
2010-08-04 14:21:27 ·冀東油田南堡43-X4806井完井
2010-07-07 10:10:47 ·勝利油田首次成功應(yīng)用海上旋轉(zhuǎn)尾管完井技術(shù)
2010-06-28 16:28:40 · 久久99精品国产麻豆婷婷| 亚洲免费综合| 欧美男人的天堂| 一本一道波多野毛片中文在线| 国产午夜精品视频| 韩日a级毛片| 欧美性猛交xxxx偷拍洗澡| 日韩黄色片网站| 国产成人免费av在线| 艳妇乳肉豪妇荡乳xxx| 欧美高清在线| 亚洲精品久久久久久久蜜桃臀| 欧美激情三区| 成人黄动漫网站免费| 成人资源www网在线最新版| 久久精品视频99| 好看的视频你懂的| 欧美一区二区三区婷婷月色| 日韩中文字幕综合| 一区二区三区不卡视频| 亚洲成人第一网站| www.色综合.com| 后入内射无码人妻一区| 视频在线观看91| 日本少妇一区二区三区| 99久久夜色精品国产亚洲狼 | 在线观看的网站你懂的| 欧美在线中文字幕| 中文字幕免费在线视频| 中文字幕亚洲无线码a| 操碰免费视频| 精品国产乱码久久久久久老虎| 性xxxxxxxxx18欧美| 日本韩国欧美国产| 成人免费一级视频| 亚洲图片欧美色图| 国产特级黄色片| 亚洲精品亚洲人成人网在线播放| 91丝袜一区二区三区| 99精品视频在线播放观看| 2025国产精品自拍| 国产在线精品一区二区| 熟女俱乐部一区二区| 亚洲欧美视频一区二区三区| 波多野结衣在线免费观看| 国产精品久久久久久久久久10秀| 成人黄色片视频| 伊人春色之综合网| 国产九九九九九| 亚州精品视频| 日本xxxxxxxxxx75| 四虎5151久久欧美毛片| 日韩 欧美 视频| 久久精品亚洲成在人线av网址| 在线观看免费黄色片| 国产精一区二区| 亚洲自拍偷拍二区| 亚洲国产中文在线二区三区免| 亚洲韩国在线| 精品国产乱码一区二区三区 | 又骚又黄的视频| 国产精品精品国产色婷婷| 波多野结衣mp4| 国产精品剧情在线亚洲| 日本视频www色| 亚洲欧美日韩久久精品| 一区二区三区精彩视频| 亚洲一区二区三区四区在线观看 | 成人免费乱码大片a毛片软件| 亚洲天堂第一页| 2018av男人天堂| 精品激情国产视频| 宅男视频免费在线观看视频| 久久久久久久久久久免费精品| 日本福利片在线| 国产成人精品999| 成人黄视频在线观看| 91在线看www| 欧美三级网站| 免费亚洲一区二区| 国产美女亚洲精品7777| www.激情网| 精品国产精品| 在线免费视频一区| 亚洲福利国产| 亚洲人成人无码网www国产 | 国产高清亚洲一区| 日本少妇性生活| 国产精品热久久久久夜色精品三区 | 国产麻豆91视频| 天天色综合成人网| 亚洲va国产日韩欧美精品色婷婷| 91精品在线免费观看| 青丝免费观看高清影视| 在线视频欧美性高潮| 一区二区三区四区在线免费视频| 欧美中文字幕第一页| 中中文字幕av在线| 久久久精品动漫| 欧美在线在线| 男人天堂网视频| 韩国一区二区三区在线观看| 亚洲天堂网一区二区| 国产精品1区2区3区在线观看| 国产午夜激情视频| 亚洲欧美日韩国产一区二区三区 | 蜜桃臀av在线| 国产成人精品视频| 高潮在线视频| 亚洲精品在线视频观看| 任你弄精品视频免费观看| 亚洲少妇第一页| 亚洲综合国产激情另类一区| 国产白丝一区二区三区| 久久久久久97三级| 国产高清免费在线观看| 欧美精品一级二级| av福利网址| 久久久久久久久久亚洲| 97影院秋霞午夜在线观看| 精品乱色一区二区中文字幕| 2020最新国产精品| 久久久精品麻豆| 亚洲综合不卡| 久草视频免费播放| 亚洲精品国产精华液| 99re5久久在热线播放| 亚洲精品99久久久久| 黄页网站免费在线观看| 国产精品视频中文字幕91| 成人va天堂| 18禁网站免费无遮挡无码中文| 午夜精品网站| 久久中文字幕精品| 国产欧美日韩另类一区| 污视频在线免费| 日韩av中文字幕在线| 三级国产在线观看| 成人在线看片| 成人直播在线观看| 日本成人xxx| 懂色av噜噜一区二区三区av| 一级特黄录像免费看| 欧美精品电影在线播放| 九七伦理97伦理| 热久久美女精品天天吊色| 欧美精品日日操| 日韩中文字幕在线免费| 在线亚洲激情| 久久久久无码国产精品不卡| 亚洲国产精品一区二区尤物区| 国产又黄又爽又猛免费app| 美女少妇精品视频| 日本三级在线观看网站 | www.精品国产| 黄色高清无遮挡| 精品一区二区综合| 一级片免费网站| 日韩色在线观看| 久草在线新视觉| av资源站久久亚洲| 偷拍亚洲精品| 人妻在线日韩免费视频| 久久久91精品国产一区二区三区| 男人天堂综合网| 亚洲毛片在线看| 日本精品在线| 亚洲第一精品区| 亚洲精品专区| 中文字幕一区二区三区精品| 日韩欧美在线视频| 99热在线看| 亚洲aⅴ男人的天堂在线观看 | 91野花视频| 2021国产精品视频| 成人一级视频| 成人综合久久网| 波多野结衣视频一区| 五月婷婷久久久| xxx成人少妇69| 韩日毛片在线观看| 国产一区二区三区精彩视频| 久久激五月天综合精品| 国产一区二区三区中文字幕| 亚洲精品在线免费播放| 第三区美女视频在线| 亚洲AV无码成人精品一区| 夜夜嗨一区二区三区| av大片在线免费观看| 制服丝袜激情欧洲亚洲| 邻居大乳一区二区三区| 亚洲欧洲久久| 国产精品亚洲综合色区韩国| 久久久蜜桃一区二区| 精品欧美久久久| 在线观看黄色av| 免费网站在线观看视频| 麻豆91在线播放免费| 精品免费久久久| 自拍视频国产精品|